Zenith Awards 2008

ProSys Engineering a Zenith Award Finalist in 2008! 

For the third consecutive year, our entry in the Oil, Gas and Hydrocarbons category of the PACE magazine Zenith Awards has been selected as a finalist.  This year we submitted a joint entry with Santos entitled "Moomba Gas Plant Throughput Maximisation".  Our entry describes the development of a suite of Multivariable Predictive Control applications designed to optimise the pressure profile through the plant and increase sales gas production.

We are delighted with the achievement of again being a finalist and the recognition by the judges of the substantial value delivered by these advanced process control improvements (that is, tangible production improvement without the need for any hardware modifications or plant interruption).  Read our 2008 PACE Magazine Zenith Award Submission "Moomba Gas Plant Throughput Maximisation" here.